{"id":135,"date":"2025-01-16T15:59:14","date_gmt":"2025-01-16T15:59:14","guid":{"rendered":"https:\/\/dev4.bakeinc.ca\/?p=135"},"modified":"2025-07-21T18:37:34","modified_gmt":"2025-07-21T18:37:34","slug":"operation","status":"publish","type":"post","link":"https:\/\/geoxergy.com\/index.php\/2025\/01\/16\/operation\/","title":{"rendered":"Operation"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Operation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Once the building is commissioned, the system must be monitored over the coming months and years to ensure it operates as intended. During this time we:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Review the energy load profile to ensure it is consistent with the original energy model and related assumptions.<\/li>\n\n\n\n<li>Observe operations of major mechanical equipment to ensure it is efficient and operating as per design sequence.<\/li>\n\n\n\n<li>Collect operating data (I.e. flow rates and temperatures) from the ground loop to confirm it is performing as designed.<\/li>\n\n\n\n<li>Provide recommendations on any required changes to operating setpoints as needed to create a balanced long-term operating profile.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Operation Once the building is commissioned, the system must be monitored over the coming months and years to ensure it operates as intended. During this time we:<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[7],"tags":[],"class_list":["post-135","post","type-post","status-publish","format-standard","hentry","category-our-process"],"acf":[],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"custom-large-size":false,"ultp_layout_landscape_large":false,"ultp_layout_landscape":false,"ultp_layout_portrait":false,"ultp_layout_square":false,"psacp-medium":false},"uagb_author_info":{"display_name":"Christopher Oxner","author_link":"https:\/\/geoxergy.com\/index.php\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Operation Once the building is commissioned, the system must be monitored over the coming months and years to ensure it operates as intended. During this time we:","_links":{"self":[{"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/posts\/135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/comments?post=135"}],"version-history":[{"count":2,"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/posts\/135\/revisions"}],"predecessor-version":[{"id":471,"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/posts\/135\/revisions\/471"}],"wp:attachment":[{"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/media?parent=135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/categories?post=135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/geoxergy.com\/index.php\/wp-json\/wp\/v2\/tags?post=135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}