Operation

Operation Once the building is commissioned, the system must be monitored over the coming months and years to ensure it operates as intended. During this time we:


Posted

in

by

Tags:

Operation

Once the building is commissioned, the system must be monitored over the coming months and years to ensure it operates as intended. During this time we:

  • Review the energy load profile to ensure it is consistent with the original energy model and related assumptions.
  • Observe operations of major mechanical equipment to ensure it is efficient and operating as per design sequence.
  • Collect operating data (I.e. flow rates and temperatures) from the ground loop to confirm it is performing as designed.
  • Provide recommendations on any required changes to operating setpoints as needed to create a balanced long-term operating profile.